What are the precautions for EPS component installation?

2019-06-13
second

What are the precautions for EPS component installation? Hainan Sculpture I will introduce you.

1. Members can be directly installed on reinforced concrete or brick concrete plastered walls; If the wall EPS external wall insulation hollow brick, aerated concrete block or other lightweight materials, etc., must be installed by the designer according to the actual situation on the site, for example, light steel keel frame, wooden dragon skeleton, etc. shall be fixed on the load-bearing structure (column, beam, plate), and the components shall be fixed on it after anti-corrosion treatment.

2. Before construction, check whether the wall meets the design requirements. If there are quality problems, repair them to reach a certain bearing capacity before construction.

3. In order to ensure the quality of decoration works, there shall be no wet operation or operation that may pollute the decoration works on the construction surface.

4. The installation sequence of components shall be from bottom to top. The components must be installed with open joints and pointed with 1:2 cement mortar.

5. After the installation of components, the joints and rubs must be treated in time, the gaps shall be blocked with 1:2 cement mortar, and polished with emery cloth or angle grinder.

6. When the component needs to be cut at the corner, it shall be processed on the ground and then handed to the installation personnel for construction.

7. During the installation of components, the setting out shall be carried out on the wall according to the design layout. After installation, ensure that the components are horizontal and vertical and meet the design requirements.

8. During construction, the ambient temperature shall not be greater than 38 ℃ and not lower than 5 ℃. When the temperature is lower than this, the adhesive mortar must use antifreeze formula. The wind force is not greater than Level 5.

9. Before installing and cutting EPS components, the wall does not need to be watered. Dust, stains and other sundries that affect the bonding strength should be cleaned up.

10. During installation, the assembly joint shall be left in the middle of the whole EPS component as far as possible.

11. When bonding EPS components, mortar water shall be added according to the recommended amount of water. However, the amount of water added in mortar during splicing shall be 1-2% more than the recommended amount. More about Hainan sculpture Hainan GRC component Hainan EPS component Please pay attention to the official website of Hainan Jin'ao Garden Sculpture Art Co., Ltd.

 Hainan EPS component


Recent browsing:

T e l: thirteen billion three hundred and sixty-eight million nine hundred and eighty thousand six hundred and sixty-six

Mobile: 13368980666

Address: Room 305, Building 5, Changmao Chaoting, No. 18 Yingbin Avenue, Longhua District, Haikou