夜上海社区论坛

It is the perfect combination of sculpture art and quality

Specialized in design, creation, production and installation 's company


contact number

thirteen billion three hundred and sixty-eight million nine hundred and eighty thousand six hundred and sixty-six

 Hainan EPS component universal banner
Your current location: home page > News > Industry trends

How to deal with base course in EPS foam line construction

2022-05-09
second

During the base course treatment of EPS foam lines, other construction procedures such as wall installation, window and door openings should have been completed and accepted.



Cleaning of EPS foam line base course: clean the remaining floating ash, release agent oil stain and other sundries on the concrete wall surface, and the plastering hollowing parts. It is required that the surface flatness deviation of the pasted polystyrene board shall not exceed 4mm. If the deviation is out of tolerance, the protruding wall surface shall be polished. Dongguan Baroque shall repair the concave part to ensure the flatness of the whole wall surface is within 4mm, and the internal and external corners are square and smooth from top to bottom.

Remove the cracked concrete blocks, inclusions, hollows, etc. at the wall joints and repair them again; The overhanging eaves of window sill shall be sloped with 2% cement mortar, and various openings of the external wall shall be filled tightly.

Hainan Sculpture Hainan GRC component Hainan EPS

label

Previous: Advantages of EPS foam line 2022-04-27
Next: What are EPS lines? 2022-05-09

Recent browsing:

Related products

Related news

T e l: thirteen billion three hundred and sixty-eight million nine hundred and eighty thousand six hundred and sixty-six

Mobile: 13368980666

Address: Room 305, Building 5, Changmao Chaoting, No. 18 Yingbin Avenue, Longhua District, Haikou