What are the EPS line construction processes? What is the EPS line construction process?
EPS line construction process, pre construction preparation
Before construction, use a level gauge to measure the horizontal line, determine the wall laying position according to the size of eps lines, snap the working line with an ink fountain, and require joint paving.
EPS line construction process, mixing of adhesive
Pour the binder into a special container, and mix the powder and water in a certain proportion. Slowly pour the binder into the container while stirring.
EPS line construction process and paving operation
Scrape the mixed adhesive on the wall of the work area, and the hanging brush is required to be flat, full and even. Scrape the EPS line and apply the adhesive evenly. Pave the EPS line coated with the adhesive onto the wall with the adhesive scraped in advance, determine the lower opening of the EPS finished line, flush with the snap line, and stick it firmly and smoothly. Pave the second EPS line according to the same method, Note that the gap between the first EPS line and the second EPS line should be controlled at about 6-8mm.
EPS line construction process, pointing operation
In the joints of two EPS lines, sufficient foam glue shall be filled for bonding, so as to avoid the influence on the later operation due to the cracking of the joints caused by thermal expansion and cold contraction. The excess foam glue between the gaps of EPS lines shall be cut off with an art knife, and the flexible joint filler shall be used for pointing.